*DIAGRAM

*FREE

ID WASHINGTON AVENUE STORM DRAIN

ID

ID INPUT FILE = MAINLINE.DAT

ID INPUT FILE DATE = APRIL 2013

ID DESIGN STORM = 100-YEAR 6-HR STORM

ID STORM DISTRIBUTION = SDN #3

ID MODELED BY ATKINS (RITU GUPTA, EI, CFM)

ID CHECKED BY ATKINS (BRIAN ROWLEY, PE, CFM)

ID STORM CENTERING = AREA UPSTREAM OF COMBINATION POINT CCVG20-C

ID AT VEGAS/RANCHO INTERSECTION HAS BEEN REMOVED FROM MPU REFERENCED MODEL

ID (PRODUCES PEAK FLOW AT WASHINGTON)

ID REFERENCED HYDROLOGIC MODELS:

ID 2008 LAS VEGAS VALLEY FLOOD CONTROL DISTRICT

ID MASTER PLAN UPDATE (PBS&J, SEPTEMBER 2008)

ID US-95 WIDENING PROJECT, FINAL OVERALL PROJECT DRAINAGE DESIGN REPORT

ID (VTN NEVADA, MAY 2003)

ID

ID JR CARDS CONTAIN DARFS BASED ON THE FOLLOWING VALUES:

ID

ID AREA DARF

ID SQ. MI.

ID 0-0.5 0.99

ID 0.5-1 0.975

ID 1-2 0.95

ID 2-3 0.925

ID 3-4 0.915

ID

IT5 0 0 300

IO5 0 0

IN5 0 0

JRPREC 0.99 0.975 0.95 0.925 0.915

*

KKOG011AC2

BA0.120

PB2.77

PC0.000 0.020 0.057 0.070 0.087 0.108 0.124 0.130 0.130 0.130

PC0.130 0.130 0.130 0.133 0.140 0.142 0.148 0.158 0.172 0.181

PC0.190 0.197 0.199 0.200 0.201 0.204 0.214 0.229 0.241 0.249

PC0.251 0.256 0.270 0.278 0.281 0.283 0.295 0.322 0.352 0.409

PC0.499 0.590 0.710 0.744 0.781 0.812 0.819 0.835 0.851 0.856

PC0.860 0.868 0.876 0.888 0.910 0.926 0.937 0.950 0.970 0.976

PC0.982 0.985 0.987 0.989 0.990 0.993 0.993 0.994 0.995 0.998

PC0.998 0.999 1.000

LS0 91.4

UD0.220

*

KKOG011AD

KM45 CFS GOES EAST TOWARD RAINBOW IN SD

KMBASED ON FINAL OVERALL PROJECT DRAINAGE DESIGN REPORT

KMFOR US 95 WIDENING BY VTN (MAY 2003)

DTOG011D

DI0 45 100 500 994 10000

DQ0 0 55 455 949 9955

*

KKROG011AD

KMROUTE OG011AD TO CWA01-C

KMWASHINGTON

RD3200 0.0171 0.016 0 TRAP 0 50

*

KKWA01-C

BA0.195

PB2.77

LS0 88.7

UD 0.249

*

KKCWA01-C

KMCOMBINE ROG011AD AMD WA01-C

KMTORREY PINES AND WASHINGTON

HC2

*

KKRCWA01-C

KMROUTE CWA01-C TO CWA04-C

KMWASHINGTON

RD4980 0.01307 0.016 0 TRAP 0 50

*

KKWA04-C

BA0.197

PB2.77

LS0 87.2

UD 0.397

*

KKCWA04-C

KMCOMBINE RCWA01-C AND WA04-C

KMMICHAEL AND WASHINGTON

HC2

*

KKRCWA04-C

KMROUTE CWA04-C TO CWA09-C

KMFACILITY = FREEWAY CHANNEL

KMFACILITY # = LV15 0602

KMLINING = RCP

RD6460 0.0159 0.013 0 CIRC 8 0

*

KKWA09-C

BA0.114

PB2.77

LS0 91.2

UD 0.361

*

KKCWA09-C

KMCOMBINE RCWA04-C AND WA09-C

KMVALLEY VIEW AND WASHINGTON

HC2

*

KKWA10-C

BA0.399

PB2.77

LS0 88.0

UD 0.525

*

KKWA10D

KMFLOW SPLIT TO SOUTHWEST CENTRAL BASIN

KMOPPOSITE SPLIT OF WA10NW IN SOUTHWEST CENTRAL BASIN FLOW

KMFROM FINAL OVERALL PROJECT DRAINAGE DESIGN REPORT BY VTN (MAY 2003)

KMCAPACITY OF CHANNEL = 250 CFS IS DIVERTED

KMEXCESS FLOW CONTINUES DOWN WASHINGTON

DTWA10SE

DI0 10 250 275 300 800 1000 3000

DQ0 10 250 250 250 250 250 250

*

KKCWA10NW

KMCOMBINE CWA09-C AND WA10D

KMVALLEY VIEW AND WASHINGTON

HC2

*

KKRCWA10NW

KMROUTE CWA10NW TO CWA13-C

KMFACILITY = FREEWAY CHANNEL

KMFACILITY # = LV15 0528

KMLINING = RCB

RD4625 0.0119 0.015 0 TRAP 8 0

*

KKWA13-C

BA0.368

PB2.77

LS0 90.0

UD 0.544

*

KKCWA13-C

KMCOMBINE RCWA10NW AND WA13-C

KMRANCHO DRIVE AND WASHINGTON

HC2

*

KKDCWA13

KMFLOW SPLIT TO SOUTHWEST CENTRAL BASIN

KMRANCHO AND WASHINGTON

KMREFERENCED FROM US-95 WIDENING PROJECT

KMFINAL OVERALL PROJECT DRAINAGE DESIGN REPORT BY VTN (MAY 2003)

DTWA13SE

DI0 500 812 1000 1200

DQ 0 360 585 720 865

*

KKRDCWA13

KMROUTE DCWA13 TO CWA15A-C

KMFACILITY = FREEWAY CHANNEL

KMFACILITY # = LV15 0474, 0424

KMLINING = RCB

RD5380 0.0073 0.015 0 TRAP 8 0

*

KKWA15A-C

BA0.426

PB2.77

LS0 90.6

UD 0.633

*

KKCWA15A-C

KMCOMBINE RDCWA13 AND WA15A-C

KMMARTIN LUTHER KING AND WASHINGTON

HC2

*

KKVG07

BA0.354

PB2.77

LS0 81.3

UD 0.483

*

KKRVG07

KMROUTE VG07 TO CVG07

KMMARTIN LUTHER KING

RD850 0.005 0.013 0 CIRC 6 0

*

KKCVG07

KMCOMBINE RVG07 AND CWA20-C

KMMARTIN LUTHER KING AND WASHINGTON

HC2

*

ZZ